Crawlix.
A desktop SEO crawler that audits websites without sending a byte anywhere. Built in 3 months; downloadable at crawlix.app today.
Exhibit Acrawlix.app — the product site
This one is mine.
Crawlix is my own product, not client work. I ship it to people I’ve never met, document it and keep it running. All of it is mine: the crawler, the website, the docs, the changelog and the report pipeline.
If you want to evaluate my work without taking my word for anything, this is the fastest way: download it and crawl your own site.
SEO tools want your client’s data.
Most serious SEO crawlers are rented cloud tools. To audit a site, you upload its structure (every URL, every title, every technical weakness) to someone else’s servers. For an agency with clients in finance, healthcare, or government, that’s a compliance conversation nobody wants to have.
The desktop alternatives were either aging, shallow, or priced for enterprises. The gap: a modern crawler that runs entirely on the user’s machine and still matches the depth of the cloud tools.
The obvious business model, declined.
A cloud version was the obvious way to build this: subscriptions, dashboards, telemetry and recurring revenue. It was rejected because it breaks the one promise the product makes.
Native apps per platform were rejected too: one person maintaining three codebases ships slowly. Electron gave one codebase for Windows, Linux, and (soon) macOS, and the crawl engine lives in Node.js worker threads where the platform makes no difference.
A crawler that phones home can’t call itself privacy-first.
A crawler, a report engine, and the site that sells them.
The app runs 97+ technical SEO checks per page: on-page elements, meta tags, structured data, internal linking, image optimization and Core Web Vitals. A multi-threaded crawl engine processes pages concurrently, at speeds comparable to the cloud tools.
Around the checks: white-label PDF reports agencies can hand to clients under their own name, an AI search readiness score for how well pages hold up in AI-powered search, and a local SQLite history so every crawl can be compared against the last one. The app sends no telemetry, so I couldn’t see your data if I wanted to.
The marketing site is part of the build: Astro 5, self-hosted on my own server, with docs, changelog, comparison pages, and the download pipeline.
I run what I ship.
Electron React Node.js SQLite TypeScript Astro
the same standard your project gets: built, documented, and still running.
Book a free 20-minute call