maamoon mara.
SVEN
Book a call
The logbook

Entry — August 10, 2026the trust · vetting13 min read

Eight questions I wish clients asked me — and the answers that should worry you.

Buyers ask about price and timeline, then stop. The questions that actually sort developers — about failures, refusals, data custody, year-two rates, uptime arithmetic, and AI — almost never come up. Here are the eight I keep waiting for, the worrying answers to each, and a sheet you can paste into your next vetting email.

On the 20-minute calls, the questions are always the same three. What will it cost, how long will it take, have you built something like this. Fair questions; the site answers them before the call ever happens. But the questions that would actually sort a good developer from an expensive mistake almost never get asked. This entry is those questions, eight of them, with the worrying answers spelled out. A vetting question is only useful when you know what a bad answer sounds like. The compressed sheet waits in §8, written to be forwarded whole, my own name included.

§1Why these eight

flagged in review

Good answers contain numbers, names, and documents. The answers that should worry you share a grammar: no number, no name, no paper — just confidence.

This sheet extends two that already exist on this site, so nothing here repeats them. The ownership entry armed you with the questions about rights: who assigns what, when, and where the repository lives. The pricing entry armed you with the four money questions, starting with “who pays when the estimate is wrong?” Ask those first; they’re the load-bearing ones. The eight below are the second round — the ones that test the person rather than the paperwork. And yes, I answer all eight myself in §7, in writing, so the sheet cuts both ways.

Why don’t buyers ask these? Partly information asymmetry, partly a politeness that costs five figures. The developer across the table has answered “what does it cost” a hundred times; the rehearsal is bulletproof by now. These eight are different on purpose. For a developer with real answers, they cost nothing — thirty minutes of writing things that already exist. For a developer without them, every question is expensive to fake, because each one asks for an artifact rather than an assurance. That asymmetry is the whole design. You’re not testing knowledge. You’re testing whether the paperwork of a serious practice exists.

Deliver them in writing, two days before the call, and say the answers can be short. Written answers do three things a call can’t. They become exhibits — the contract can cite them, and question 6’s rate or question 5’s deletion date moves from chat to clause. They can be compared side by side when you’re vetting two candidates. And they remove the charisma variable, which is the variable doing the most damage in this purchase.

§2The past: questions 1–2

Question 1: “Who can I call about you?” Not a logo wall, not a testimonial page. A name and a number: someone who paid this developer and lived with the result for a year. One reference who answers a phone outweighs twelve quotes on a website, because you can ask the reference your own questions. The worrying answers: “client confidentiality” doing all the work; testimonials with first names only; a portfolio of screenshots nobody can verify. Confidentiality is real, and a developer with ten clients can still produce one who’ll take a call. When you get the reference on the phone, ask two things only. What surprised you after launch? And would you use this developer for the next build? The first question surfaces what the sales process hid. The second is the entire review, compressed; everything else a reference says is pleasantries. Ask also when that build shipped. A 2019 reference vouches for a different developer than the one quoting you, because tooling, prices, and the person have all moved since.

Question 2: “Tell me about a build that went badly.” Every developer who has shipped real work has a scar: an estimate that broke, a launch that slipped, a client relationship that soured. You’re not collecting gossip. You’re checking whether the person can name their own failure mechanism, because the one who can’t will repeat it on your invoice. The worrying answers: “nothing comes to mind.” A story where every villain is a client. Blame aimed at a tool or a stack, as if hands weren’t on the keyboard. Or the deflection-to-process answer (“my methodology prevents that”), which is the same claim wearing a suit. The good answer has three parts. What went wrong, the mechanism by name (under-scoped integrations, a vanished client contact, an optimistic estimate), and what changed afterward. Past tense, specific, finished. People who talk about failure that way have finished failing at it.

§3The limits: questions 3–4

Question 3: “What won’t you build for me?” A developer with no refusals is a meter with legs. The same silence shows up in pricing, which is the subject of the entry on cheap quotes. A quote that names nothing it excludes has excluded it anyway. Somebody who sells builds should be able to name the jobs they turn down. Work outside their stack, scale they haven’t operated, ideas that should stay rented, processes too unstable to photograph. The refusal list is where you learn whether the yes means anything. The worrying answers: “whatever you need.” Any answer that expands mid-sentence. A specialist who has never met a project outside their specialty isn’t a specialist; they’re an optimist with a rate card. The good answer sounds like a boundary drawn from experience. Named categories, named reasons, at least one “that should stay rented.” A builder who can recommend against building is selling a second product called judgment.

Question 4: “If this ends in a year, how many developers could take it over?” This is the succession question, and it has an actual number. My builds run on PostgreSQL and Node.js because the pool matters: Stack Overflow’s 2025 survey puts PostgreSQL at 55.6% of developers, the most-used database on earth, and Node.js at 48.7%. Hiring from half of all developers is a Tuesday; hiring from a niche is a ransom negotiation. The worrying answers: a proprietary framework, “my own CMS,” a language you’ve never heard of justified by enthusiasm. The stack is the job post you’ll write later. Ask to see it now. A concrete follow-up: have the developer draft, in three lines, the ad you’d run to replace them. If the draft reads like a conference badge from a niche meetup, you’ve learned what the succession costs. If it reads like every developer job board, the pool is real.

§4The custody: questions 5–6

Question 5: “What copies of my data will you hold, and when do they get deleted?” During a build, a developer usually works against a copy of your real records — customers, prices, sometimes payroll. Someone should be able to tell you where that copy lives, who else can reach it, and the date it gets destroyed. European law already expects this shape: GDPR’s Article 28 requires processors to delete or return personal data when the services end. The worrying answers: a blank look. “It’s on my laptop.” Anything implying your customer table is currently in a folder called projects-old. The good answer names a place, a person, and a date. The copy lives on the project server, two named people can reach it, it’s destroyed at handover, and the deletion goes in the contract. Bonus tell for 2026: ask whether your records ever get pasted into AI tools. That’s question 5 and question 8 shaking hands, and a good developer has already thought about the handshake.

Question 6: “What do you charge in year two, in numbers, today?” Launch-day pricing is on every proposal; year-two pricing is where the surprises live. The contract-read entry taught you to fear the words “then-current rates” in vendor agreements. The same trick hides in developer relationships as “that gets sorted later.” The worrying answers: any refusal to put an hourly number on paper before the build starts; a retainer you must keep paying to stay important; support that only exists bundled with hosting they control. The number can change in year three. It should exist in year zero. The good answer is one sentence with a currency symbol in it, plus what the warranty already covers so you can tell the two apart. A written rate also prices your alternatives. Once year-two support is $X an hour on paper, you can compare it against a vendor tier, a retainer, or doing nothing.

§5The operations: questions 7–8

Question 7: “When you say the system will be reliable, measured how?” Percentages without measurement methods are moods. NIST wrote a whole publication on this, SP 500-307, and its one transferable idea fits in a sentence. A metric needs a definition, a measurement method, and a context, or it isn’t a metric. So push on any reliability claim: 99.9% of what, measured by whom, over what window, and what happens when it’s missed? The worrying answers: a bigger percentage. Numbers quoted with no monitoring tool named. Any promise with no remedy attached — a commitment without a consequence is a decoration. The good answer scales to the system. For a small internal tool: a named monitoring service, a response promise in hours, and a runbook a stranger has tested. That beats any percentage recited from a sales page.

Question 8: “Where does AI sit in your process, and what reviews its output?” In 2026 this question sorts harder than any other, and both extreme answers should worry you. “I don’t use it at all” is either untrue or a working speed you’ll pay for by the hour. “It writes everything” with no review step means your system’s correctness is nobody’s job. The good answer names tasks and a checkpoint. What the tools draft, what a human verifies, who owns a bug regardless of what typed it. Accountability that survives the tooling is the whole point. The warranty question is a clean follow-up: does the coverage care whether a human or a model introduced the bug? Mine doesn’t — a bug is a bug.

§6How to read any answer

Across all eight, score the grammar before the content. Good answers reach for something outside the conversation: a document, a named person, a number that could be checked, a date. Worrying answers stay inside the conversation — adjectives, assurances, and speed. Speed matters double here. The fast, confident answer to a failure or custody question is often the rehearsed one. The developer who says “let me check my contract and send you the clause” is showing you month six in advance.

And notice which questions offend. None of these eight are hostile; every one has a boring professional answer. Someone who bristles at the data-custody question in the sales conversation, the moment your position is strongest, is answering a ninth question you didn’t ask. Walk on the bristle, not on the gap — gaps can be fixed by a person who treats the question as reasonable.

One meta-tell finishes the scoring. Count the documents offered across all eight answers: contracts, runbooks, rate sheets, reference contacts, deletion clauses. Three or more and you’re dealing with a practice. Zero, and you’re dealing with a personality. Personalities can write excellent code. They cannot be handed a business.

And if you’re worried you can’t judge the technical content of the answers — you don’t have to. Every question here scores on form: is there a number, a name, a document, a date. That’s deliberate. Form is checkable by any owner in any industry, and practitioners with good form overwhelmingly have the substance to match. Count the documents in §7 as you read it; the target applies to me too.

§7My own answers, in writing

The sheet cuts both ways, so here is where this site already commits, question by question. References: three named case studies (Crawlix, JetZone, the inventory system). A phone call with a past client can be arranged on request, confidentiality permitting, and it usually does permit. The refusal list is published. Six cases where renting wins, plus the scoping week’s standing right to end in “don’t build.” Succession: PostgreSQL and Node.js, the 55.6% and 48.7% pools, repo in your account from day one. Year-two terms: the 60-day warranty covers bugs I introduced. Ongoing care beyond it is a monthly plan from $295, month to month, priced before the build starts. The number exists in year zero, per question 6’s own rule, and the build itself lands between $8,000 and $25,000, fixed at quote stage.

Data custody: build-time copies live on the project server or an encrypted disk, never on shared machines, and are destroyed at handover. Put the deletion date in the contract; I’ll sign it. Reliability: no percentage theater for an eight-person system. You get monitoring that texts, a runbook a stranger tested per the handover rules, and a bill naming every operational duty. AI: it drafts, I review, and the warranty doesn’t ask what typed the bug. And the failure story — that one I tell on calls, not in print, which is itself an answer you can judge. Ask me and time the pause. Run §6’s meta-tell on the lot: warranty, rate, deletion clause, runbook, bill, case studies. Six documents, counted the same way you should count anyone’s.

§8The sheet, ready to send

The eight, compressed for pasting into an email or reading down a phone line. Two rounds work well (questions 1–4 before the first call, 5–8 with the follow-up) so nobody answers eight essays cold:

  • 1. Who can I call about you?
  • 2. Tell me about a build that went badly.
  • 3. What won’t you build for me?
  • 4. If this ends in a year, how many developers could take it over?
  • 5. What copies of my data will you hold, and when are they deleted?
  • 6. What do you charge in year two, in numbers, today?
  • 7. “Reliable” — measured how, and what happens when it’s missed?
  • 8. Where does AI sit in your process, and what reviews it?

When a machine did the typing, one more belongs beside these eight: whether AI-generated code is safe to run a business on. It is question eight again, asked about a different author. Send them before the first call, the way the brief entry sends the Monday stories. Any developer worth five figures of your money can answer eight questions in writing. The ones who answer with numbers, names, and documents have just shown you year two in advance. I reply within 24 hours, sheet included. The pause before someone else’s answer is data too. Time it.

And if the answers come back bad from a developer you otherwise like? That happens, and it isn’t automatically a no. It’s a price. Missing paperwork can be built. The rate can go in writing this week, the deletion date into the contract, the reference offered next quarter when a project wraps. What can’t be negotiated is the bristle. The sheet’s last service is to you rather than about them. A buyer who asks these eight, politely, in writing, has just become the kind of client serious developers compete for.

Sources — checked August 10, 2026
  1. NIST — Special Publication 500-307, Cloud Computing Service Metrics Description (2018): a metric needs a definition and a measurement method, or it isn’t one — nvlpubs.nist.gov/nistpubs/SpecialPublications/NIST.SP.500-307.pdf
  2. Stack Overflow — Developer Survey 2025, technology section (PostgreSQL the most-used database at 55.6%; Node.js 48.7%) — survey.stackoverflow.co/2025/technology
  3. EUR-Lex — GDPR Article 28(3)(g): processors delete or return all personal data after the end of services — eur-lex.europa.eu/legal-content/EN/TXT/?uri=CELEX%3A32016R0679

— maamoon mara.

filed underthe trust · vetting
got a project like thisbook the free call