Before I quote a database replacement for a groaning workbook, I ask for something that surprises people: a month of rules first. Twenty of them, listed below. Some clients hear this as a delay tactic. It’s the opposite of one — the rules are designed to make my quote unnecessary, and they often succeed. The ones who come back after the month arrive with a disciplined file, a documented process, and a build that costs less to scope. The ones who don’t come back got a working spreadsheet for the price of an afternoon’s discipline. Both outcomes beat selling software to a mess, and both are cheaper for you than the third path, where a developer quotes the chaos as-is and everyone pays for the confusion in change orders.
§1Rules before quotes
The logic is the same one the diagnostic entry runs. Most “dying” spreadsheets have hygiene and structure problems wearing a replacement costume. And a $20,000 build quoted against a chaotic file inherits the chaos. Rules first means the build (if one still makes sense) gets specified from a file that tells the truth. A disciplined workbook is the cheapest requirements document on earth. An undisciplined one costs its owner the difference, one confused quote at a time.
These twenty rules are designed to delay the database quote, often by six months or more — and that is usually the right outcome.
Adopt them in any order, but read them in order, because the groups build: the file, the grid, the humans, the exits. Each rule names the failure it prevents, because a rule without its failure is just etiquette. Print the four groups and tape them next to the monitor of whoever owns the file. Then treat the list the way kitchens treat handwashing signs: boring, visible, and cheaper than the alternative. Nobody frames a handwashing sign either. One more note on audience: this list is for the owner, not the guardian. The guardian already knows most of it and lacks the authority to enforce any of it. Adoption is a management act, which is also why it works: the rules arrive with authority attached instead of as one more thing the guardian begs for.
§2The pedigree — accountants wrote this playbook
None of this is developer folklore. The accountancy profession runs more consequential spreadsheets than any other trade, and it wrote the rulebook. ICAEW’s Twenty Principles for Good Spreadsheet Practice arrived in 2013 and has been updated since; the fourth edition landed in 2024. Accountants got there first for a blunt reason: their spreadsheet errors get audited, publicly, with signatures attached. Yours just quietly reorder a warehouse. My list below is that thinking, bent toward the operations workbooks small businesses actually run, and numbered my own way. Where a rule is pure ICAEW, the credit is theirs. And a note on why twenty rather than a greatest-hits five: the groups protect each other. Grid discipline decays without the human rules to defend it, the human rules go unenforced without the file rules that make violations visible, and the exit rules are what save you in the quarter when the other fifteen slipped. Cherry-picking builds a fence with three sides.
The stakes have a research literature too. Ray Panko’s spreadsheet research makes the core point. A spreadsheet is a program, written by people who don’t call themselves programmers, tested by nobody. Software built the way I build it ships with tests that run on every change. The average workbook ships with a feeling of confidence and a formula bar. And EuSpRIG’s horror-story archive collects what that produces at scale. Two famous residents. An Excel copy-paste error inside JPMorgan’s risk model contributed to the 2012 “London Whale” losses of over $6 billion. And in the Reinhart–Rogoff austerity paper, a formula that skipped rows helped turn +2.2% average growth into the published −0.1% that governments quoted. Your jobs tracker is smaller than a bank. The failure mechanics are identical.
§3Rules 1–5: the file
- 01 · One master file, one location, zero emailed copies. Prevents: the FINAL_v7_REALLY problem, and the quiet fork where two truths diverge for a month. In practice: one shared drive location, a link instead of an attachment, every time someone asks.
- 02 · One workbook, one job. The jobs list, the price list, and the accounts are three files, not three tabs of one. Prevents: the everything-file whose blast radius is the whole business. In practice: if a tab answers a different question than the file’s front page states, it wants its own file.
- 03 · Inputs, calculations, and outputs live on separate tabs. Straight from the ICAEW playbook. Prevents: typing over a formula because it looked like a place to type. In practice: the inputs tab gets a colored header nobody misreads; the other tabs are rule 12’s territory.
- 04 · A front page: what this file does, who owns it, when it was last verified. Prevents: the orphan workbook nobody dares delete or trust, which is most workbooks by year three. In practice: three cells (“Job tracker · Dana · verified 2026-07”) and done.
- 05 · Closed periods get archived into their own files, yearly. Prevents: history taxing every recalculation, and the illusion of the too-big file the diagnostic entry debunks with Excel’s actual ceilings. In practice: every January, last year’s rows move to “Jobs-2025.xlsx” and never come back.
§4Rules 6–10: the grid
- 06 · Data lives in real tables, not loose ranges. Tables give formulas a boundary and new rows a home. Prevents: formulas silently missing the last week of entries. In practice: select the block, press the make-it-a-table shortcut, give it a name a human would say out loud.
- 07 · One formula per column, written once, filled down. Prevents: the mid-column hand-edited exception — the exact species of error that skipped rows in the Reinhart–Rogoff paper. In practice: if one row genuinely needs different math, that difference is data; give it a column instead of a secret.
- 08 · No numbers buried inside formulas. The VAT rate, the margin, the fee: each gets one named cell that everything references. Prevents: updating a constant in eleven of its twelve hiding places. In practice: a small “settings” area on the inputs tab, every rate and fee in one column, named.
- 09 · No merged cells where data lives. Merged cells are for title pages. Prevents: sorting, filtering, and every future export from breaking in creative ways. In practice: where you want a visual group, use a category column and let formatting follow it.
- 10 · Format the used range only, and give each color one agreed meaning. Prevents: the megabyte bloat of formatted emptiness, and the folklore where yellow means urgent to one person and paid to another.
§5Rules 11–15: the humans
- 11 · Editors are named; everyone else views. Google Sheets and Excel both do this natively. Prevents: the anonymous Tuesday edit nobody can explain by Friday. In practice: share as viewer by default; editing is granted by name, and the list of names is rule 13’s first line.
- 12 · Calculation tabs are locked; only input areas accept typing. ICAEW’s principle twenty, verbatim in spirit. Prevents: the accidental formula overwrite that surfaces three reports later. In practice: both Excel and Sheets protect ranges in two clicks; leave the input areas open, lock the rest, done before lunch.
- 13 · The conventions are written down, on one page, inside the file. What the statuses mean, what the colors mean, what URGENT-in-the-title used to mean before rule 13 killed it. Prevents: rules that live in one head; the workaround-tax entry priced what happens when that head resigns. In practice: a tab called README, ten lines, written by the guardian, edited by nobody else.
- 14 · A second person can run the file, and has, at least once. The guardian’s manual from the diagnostic entry, enforced by rehearsal. Prevents: the single point of failure taking their two hours a day of column-F defense on vacation. In practice: once a quarter, the second person runs the month-end alone while the guardian watches with their hands behind their back.
- 15 · Structural changes get a log line: who, when, what. One tab, three columns, append-only. Prevents: archaeology. When a number looks wrong in March, the log says what changed in February. In practice: nobody logs cell edits — log the structural moves: a column added, a formula changed, a tab retired.
§6Rules 16–20: the exits
- 16 · A backup exists somewhere that is not the same machine, and someone has restored it once. An untested backup is a hope — the same sentence the handover entry applies to systems I build, because it’s true everywhere. In practice: cloud-synced folders count only if you’ve tested restoring an older version, which is the part everyone skips.
- 17 · The data exports clean to CSV, tested quarterly. If the export comes out mangled, you’ve learned it now, cheaply, instead of during a migration or an audit. In practice: export, reopen the CSV, and check the dates and the decimal points — the two things that always break first.
- 18 · A dependency register exists: everything that reads this file, listed. The automations, the accountant’s report, the reorder process. Prevents: the PHE pattern from the diagnostic entry — a file that became infrastructure without anyone deciding so. In practice: five lines on the front page; if the register outgrows the front page, that’s a diagnostic answer in itself.
- 19 · The file checks itself: row counts, control totals, one cell that turns red when the books don’t balance. ICAEW’s principle nineteen. Prevents: wrongness traveling quietly — the failure mode that costs more than any crash.
- 20 · A quarterly review is on the calendar: fifteen minutes, rules 1–19, tick or fix. Prevents: this entire list decaying into a document that was true in the quarter it was written. In practice: the review is the guardian reading rules 1–19 against the file and fixing drift on the spot; fifteen minutes is genuinely enough once the habits hold.
Four groups, twenty rules, one printed page. The exits group is the one nobody adopts until after their first bad Friday. Adopt it first and skip the Friday.
§7What these rules cost me
Now the part that belongs in the open. I sell database builds, and this list postpones them. A workbook under these rules loses most of the symptoms that make owners call developers. Collisions fade with rules 1 and 11. Mystery errors fade with 6 through 10. The bus-factor fear fades with 13 and 14, and the quiet wrongness with 19. If the diagnostic entry’s five questions were shouting at you, a month of rules usually turns the shouting into a hum. A hum you can live with — often for six months, sometimes for years. That’s the outcome I’m recommending, out loud, on the site where I sell the alternative. The mechanism is the same one that runs the keep-renting entry: advice that never costs the advisor anything isn’t advice. There’s a selfish half too, stated plainly. Scoping a disciplined file takes days; scoping a chaotic one eats the whole week. Clients who did the month arrive speaking their own conventions, and the scope document practically transcribes itself. It shows in the price, too, for the reason the pricing entry gave: padding is a tax on ignorance, and a disciplined file leaves less to be ignorant about. Fewer unknowns, leaner quote.
What the rules can’t fix is the container, and pretending otherwise would waste your month. Rules don’t give a grid record locking, real permissions, an audit trail deeper than rule 15’s log, or the multiplayer write access a grown operation needs. Some files fail the diagnostic entry’s questions 3, 4, and 5 regardless: other systems depend on them, a guardian defends them daily, revenue stops when they break. For those, the rules make the file cleaner and the eventual build cheaper. They won’t make the build unnecessary. Half my scoping weeks start from exactly that position: a disciplined file that has simply hit the grid’s edges. Those builds go beautifully, precisely because of the discipline. The convention page becomes vocabulary for the scope document. The dependency register becomes the integration list. Rule 15’s log becomes the change-request history nobody usually has. A month of rules doesn’t compete with a build. It’s the cheapest possible first milestone of one, performed by you, owned by you, before any contract exists.
§8The one-month adoption plan
Twenty rules adopted at once is a purge nobody survives. A month works. Week one: the file group, rules 1 through 5, starting with the backup. Rule 16 jumps the queue, always: make the copy before touching anything. Week two: the grid, rules 6 through 10, one tab at a time, using the diagnostic entry’s afternoon procedure as the opener. Week three: the humans, 11 through 15. This week is meetings, not spreadsheet work, and it decides whether the rules survive. The one meeting that matters is thirty minutes: everyone who touches the file, the conventions agreed out loud, the README tab written in the room. And if the team won’t sit for thirty minutes of rules, write that down too. Software will not fix a team that can’t adopt twenty lines of discipline. A build encodes the discipline you have, not the discipline you wish for. Week four: the exits, 16 through 20, ending with the first quarterly review booked on a real calendar. Total cost of the month: four weeks of attention and zero purchases. It’s a test you administer to your own operation before letting anyone sell to it.
Then judge by results, not virtue. If the month killed the pain: keep the file, keep the rules, spend nothing, and I mean that without a wink. If the pain is quieter but structural (the container symptoms from §7), you now hold the best possible starting position. A clean file, a written convention page, a dependency register, and a month of evidence about what actually hurts. That pack, plus the three Monday stories, is the brief. The scoping week reads disciplined workbooks in half the time, and everything it produces stays yours either way. And if week three exposed that the team won’t hold any convention at all, don’t buy software yet — that’s a management project wearing a technology costume, and the keep-renting entry’s stability test just saved you five figures. Rules first, quotes second. It’s slower by a month and cheaper by a mistake.
- ICAEW — Twenty Principles for Good Spreadsheet Practice (first issued 2013; fourth edition 2024) — www.icaew.com/technical/technology/excel-community/20-principles-for-good-spreadsheet-practice-2024-edition
- EuSpRIG — the spreadsheet horror-stories archive (European Spreadsheet Risks Interest Group) — eusprig.org/research-info/horror-stories
- The New Republic — the Reinhart–Rogoff Excel error (−0.1% became +2.2% when corrected) — newrepublic.com/article/112951/rogoff-reinhart-and-world-excel-error-research
- Ray Panko — Spreadsheet Errors: What We Know. What We Think We Can Do (EuSpRIG, 2000; spreadsheets are programs) — arxiv.org/abs/0802.3457
— maamoon mara.